Change orders

Full control of change orders – from notice to settlement

The contract sum rarely matches the final bill. AIMZ keeps track of change orders in both directions – claims coming in from subcontractors, and claims going out to the client.

The challenge

A subcontractor's claim that never reaches the client ends up on your bill

A project can have hundreds of change orders. The subcontractor always makes sure their claim gets through – but the claim going on to the client depends on someone catching it, giving notice in time, and following it to settlement. Every claim that slips through is a cost you get without the income that was meant to cover it.

Notified and accepted – but never costed

Email, Dalux and Endre handle notice, dialogue and acceptance of changes. Nobody works out the economics in them – what's left sitting there affects neither the final forecast nor the reporting.

The claim in and the claim out don't connect

The claim from the subcontractor and the claim going on to the client are tracked separately, each in its own spreadsheet. That makes it hard to keep track of which claims have actually been passed on – and easy to lose one out of a hundred along the way.

Deadlines that slip

Notice "without undue delay" applies further up the chain too. Without a date received and a date answered, nobody sees which deadlines are running – and if the deadline against the client slips, the claim can be lost even though the cost from the subcontractor stands.

How AIMZ works

The whole change picture, in both directions

01

Subcontractor and client change orders in the same chain

A change order from the client often becomes an instruction to a subcontractor – and a claim from a subcontractor often becomes a claim passed on to the client. AIMZ links the two, so the cost and the income on the same change order stay connected. You instantly see which subcontractor claims are missing a corresponding claim against the client – and what you're actually making on each change order.

Subcontractor change orders carried through to client change orders, with a visible linkWith or without income per change order – margin and variance visibleA subcontractor change order as a counterclaim against another subcontractor, just as easily
Subcontractor → you
CO 05 · cost claim
298,000
Set cost
What you expect it to land at
320,000
You → client
Change order CO 14 · income claim
368,000
Contribution margin on the change order28,000
02

The whole course from notice to settlement

A change order isn't always settled right away. It's notified, priced, negotiated – and can end up approved, rejected, disputed or withdrawn. AIMZ tracks every step, with a date received and a date answered, so you see how long a case has been sitting – and with whom.

Statuses: notice, claim, offer, approved, rejected, disputed, withdrawnRevision number and date on every version of the claimFull history of status and cost, per change order
Status and history
Notice received from subcontractor02.05.2026
Priced claim received08.05.2026
Passed on to client12.05.2026
Approved by client27.05.2026
03

What the client sees isn't always what it costs you

Sometimes you want to show the client a cost price as the basis for the markup, without the amount hitting the final forecast – because the cost already sits in the subcontractor contract, or because it's marginal for you. AIMZ therefore keeps cost price and cost as two separate fields. They follow each other by default, but can be deliberately decoupled.

Cost price is the basis for the income claimCost is what hits the final forecastSchedule impact in working days, with a note
Cost price
Shown to the client as the basis for the crane markup.
42,000
Cost
Doesn't hit the final forecast – no real cost accrues.
0
The crane was already on site – no real additional cost

What projects get out of it

7
statuses covering the whole course from notice to settlement
2
chains linked together – cost claims from subcontractors and income claims against the client
100%
of change orders with a date received, a date answered and a revision number

Questions we often get

What's the difference between a cost claim and a cost?

The cost claim is the amount the subcontractor has notified. The cost is the amount you set aside yourself, and it's the cost that adjusts the final forecast. You can set it before the negotiation is settled.

How is a counterclaim registered?

With a positive amount, like a regular change order. But the counterclaim type makes the amount reduce the final forecast instead of adding to it – you don't have to handle the sign yourself.

Can one change order against the client build on several costs?

Yes. You can link to existing costs, or create an expected addition, a subcontractor change order or a carry-through to site setup and operations directly from the dialogue.

What if cost price and cost shouldn't be the same?

They're set equal by default, but can be decoupled. That's useful when the cost already sits in the subcontractor contract, or when you're invoicing the client for something that doesn't give you a real additional cost.

See your change orders from notice to settlement

Book a demo